Our currently designated restoration/construction phases are as follows:
PHOTO SLIDESHOW -- Roof work begins, January 2010:
PROGRESS UPDATE: In January 2010, we began Phase 1 of our restoration which includes removing the sloped roof which was added in the 1960s. Our objective is to restore the original 1948 curved, painted copper roof which is underneath the sloped flat roof.

Pre-Restoration Photo, 2008. Both the large original neon sign on the roof and the clock sign in the parking lot have been carefully taken down to be repaired and will be returned to the site upon completion.